• Deutsch Deutsch German de
  • English English English en
Telefon: +49 0341 44 25 99 86
Landschaftsarchitekt Leipzig Thomas Poser
  • Home
  • Current
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
    • 2012
    • 2011
    • Press
  • Office
    • Philosophy
    • Services
    • Vita
    • Furnishing
    • Downloads
  • Portfolio
    • Outdoor facilities
    • Traffic systems
    • Framework planning
    • Private gardens
    • Preliminary planning
    • Letter references
  • Project developer
  • Garden planning
    • Garden architect
    • Planning costs
    • Portfolio
  • Rainwater harvesting
    • Portfolio
    • Interesting rainwater management
    • Rainwater infiltration
    • Drainage planning Leipzig
    • Cost benefit
    • Drainage request
    • Projects
  • Water balance
  • Sponge city
  • Contact
  • German
  • English
  • Menu Menu
Entwurf Goetheschule Dessau
Menu
  • Open spaces
  • Traffic systems
  • Private gardens

Rainwater management

Rainwater retention – Apartment building in Leipzig

Project:

Wohnpark
Zschortauer Straße 99
04129 Leipzig

Client:

Erste Salmon Projektgesellschaft mbH & Co. KG
Konrad-Adenauer-Allee 1 – 11
61118 Bad Vilbel

Project description:

  • Drainage of all roof and traffic areas via rainwater retention systems,

  • Design of runoff-reducing surface pavements,

  • Dimensioning of rainwater storage tanks.

Drained area (AE): 418m2

Rainwater infiltration – Apartment building in Leipzig

Project:

Construction of an apartment building with balconies and underground parking
Lange Straße 30
04103 Leipzig

Client:

Projektträgergesellschaft Zentrum Nord Gohlis mbH
Bavariafilmplatz 7
82031 Grünwald

Project description:

  • Drainage of all roof and traffic areas through infiltration systems,

  • Design of runoff-reducing surface pavements,

  • Calculation and construction of trough and block trenches.

Drained area (AE): 1008m2

Fee savings/year: EUR 1000 (as of 2023)

Rainwater infiltration – town house in Leipzig

Project:

New construction of a detached house
Am langen Felde 1a
04179 Leipzig

Client:

Kaiser-Müller-Immobilien GbR
Pfaffendorfer Straße 12
04105 Leipzig

Project description:

  • Drainage of all roof and traffic areas through infiltration systems,

  • Design of runoff-reducing surface pavements,

  • Calculation and construction of gravel trenches,

  • Dimensioning of rainwater storage tanks.

Drained area (AE): 300m2

Fee savings/year: EUR 300 (as of 2023)

Rainwater infiltration – Apartment house Taucha

Project:

New construction of an apartment building
Portitzer Straße 4
04429 Taucha

Client:

K + A Bauinvest GmbH
Löbauer Straße 43
04347 Leipzig

Project description:

  • Drainage of all roof and traffic areas through infiltration systems,

  • Design of runoff-reducing surface pavements,

  • Calculation and construction of trough and block trenches.

Drained area (AE): 1,008m2

Fee savings/year: EUR 1,008 (as of 2022)

Rainwater retention – Apartment building in Leipzig

Project:

New construction of an apartment building
Wurzner Straße 18
04315 Leipzig

Client:

K + A Bauinvest GmbH
Lutherstraße 9
04315 Leipzig

Project description:

  • Drainage of all roof and traffic areas through stormwater retention with curbed discharge into the public sewer system,

  • Design of runoff-reducing surface pavements,

  • Calculation and design of a stormwater retention chamber with a discharge throttle.

drained area (AE): 444 m2

Rainwater infiltration – town house in Leipzig

Project:

New construction of a detached house
Breite Straße 5a
04317 Leipzig

Client:

Staupendahl & Partner Bauplanungsgesellschaft mbH
Schmiedestraße 14
04229 Leipzig

Project description:

  • Drainage of all roof and traffic areas through infiltration systems,

  • Design of runoff-reducing surface pavements,

  • Calculation and construction of trough and block trenches.

Drained area (AE): 741m2

Fee savings/year: EUR 741 (as of 2022)

Rainwater infiltration – multi-generation house in Leipzig

Project:

New construction of an apartment building
Endersstraße 31 a
04177 Leipzig

Client:

(A) Enders Wohnen GbR
c/o raumleipzig architekten
Gohliser Straße 23
04155 Leipzig

Project description:

  • Drainage of all roof and traffic areas through infiltration systems,

  • Design of runoff-reducing surface pavements,

  • Calculation and design of swale infiltration systems.

Drained area (AE): 551m2

Fee savings/year: EUR 551 (as of 2022)

Rainwater infiltration – apartment buildings + garden house in Leipzig

Project:

Construction of two apartment buildings and a garden house
Naunhofer Strasse 71-72
04299 Leipzig

Client:

Domum Invest GmbH
Hinrichsenstrasse 31
04105 Leipzig

Project description:

  • Drainage of all roof and traffic areas through infiltration systems,

  • Planning of the extensive green roof,

  • Calculation and design of block and swale infiltration systems.

Drained area (AE): 2,191m2

Fee savings/year: EUR 2,191 (as of 2022)

Decoupling and rainwater retention – old brewery in Dessau-Roßlau

Project:

Alte Brauerei Dessau
Brauereistraße 1
06847 Dessau-Roßlau

Client:

Brauhaus Verein Dessau
Brauereistraße 1
06847 Dessau-Roßlau

Project description:

  • Decoupling of all roof and traffic areas from the urban sewage network,

  • Retention of rainwater from all decoupled roof and traffic areas via decentralized infiltration systems,

  • Planning of trough, trench and pipe trench elements,

  • Continued use of the property's internal existing lines,

  • Water supply from existing pipes located deeper to the decentralized infiltration elements according to the principle of communicating pipes via spring pots.

Drained area (AE): 27,500 m²

Fee savings/year: EUR 33,623.01 (as of 2007)

Decoupling and rainwater retention – MRR GmbH premises, Lutherstadt Wittenberg

Project:

Betriebsgelände MRR GmbH
Brauereiweg 5
06886 Lutherstadt Wittenberg

Client:

MRR Rohstoff Recycling GmbH
Antonienstraße 23
06749 Bitterfeld

Project description:

  • Retention of rainwater from all roof and traffic areas via decentralized infiltration systems,

  • selective surface unsealing at the lowest points of the existing traffic facilities,

  • Planning of trough and pipe trench elements,

  • Continued use of the property's internal existing lines.

Drained area (AE): 9,320 m²

Fee savings/year: EUR 14,539.20 (as of 2006)

Decoupling and rainwater retention – student residence in Dessau-Roßlau

Project:

Conversion of clinic building into a student residence
Schwabestraße 4
06846 Dessau-Roßlau

Client:

Mr.
Oliver Schob
Heinz-Röttger-Straße 11
06846 Dessau-Roßlau

Project description:

  • Retention of rainwater from all roof and traffic areas via decentralized infiltration systems

  • selective surface unsealing at the lowest points of the existing traffic facilities,

  • Planning of trough and pipe trench elements,

  • Planning of surface materials to reduce runoff in the traffic areas,

  • Continued use of the property's internal existing lines.

Drained area (AE): 1,310 m²

Fee savings/year: EUR 1,516.98 (as of 2006)

Rainwater infiltration – Oliver Krause water nursery in Dessau-Roßlau

Project:

Water gardening Oliver Krause
Kochstedter Kreisstraße 5
06847 Dessau-Roßlau

Client:

Mr.
Oliver Krause
Kochstedter Kreisstraße 5
06847 Dessau-Roßlau

Project description:

  • Infiltration of all roof and traffic areas,

  • Retention of rainwater from all decoupled roof and traffic areas via decentralized infiltration systems,

  • Planning of trough, trench and pipe trench elements,

  • Continued use of the property's internal existing lines,

  • Water supply from existing pipes located deeper to the decentralized infiltration elements according to the principle of communicating pipes via spring pots.

Drained area (AE): 2,255.00 m²

Fee savings/year: EUR 2,611.29 (as of 2007)

Rainwater infiltration – Landwirtschaftsgesellschaft Dessau-Mildensee GmbH

Project:

Extension/conversion
Sollnitz animal production facility
06842 Dessau-Roßlau, OT Sollnitz

Client:

Landwirtschaftsgesellschaft Dessau-Mildensee mbH
Alt Dellnau 31
06842 Dessau-Roßlau

Project description:

  • Infiltration of all roof and traffic areas,

  • Retention of rainwater from all decoupled roof and traffic areas via decentralized infiltration systems,

  • Planning of trough elements,

  • Continued use of the property's internal existing lines.

Drained area (AE): 11,200.00 m²

Fee savings/year: EUR 12,969.60 (as of 2007)

Rainwater infiltration – panel construction kit in Dessau-Roßlau

Project:

Plattenbaukasten
Kreuzbergstraße 220-234
06849 Dessau-Roßlau

Client:

Bauherrengemeinschaft
Kreuzbergstraße 220-234
06849 Dessau-Roßlau

Project description:

  • Connection of all roof and traffic areas to decentralized infiltration systems,

  • Planning of trough elements,

  • Use of drainage-reducing surface paving in the traffic areas.

Drained area (AE): 1,140.00 m²

Fee savings/year: EUR 1,320.12 (as of 2007)

Rainwater infiltration – Agrarbetrieb Dessau-Mildensee e. G.

Project:

Dessau-Waldersee dairy farm
Construction of a straw storage shed
Birnbaumweg
06844 Dessau-Roßlau

Client:

Agrarbetrieb Dessau-Mildensee e.G.
Pötnitz 6
06842 Dessau-Roßlau

Project description:

  • Infiltration of all roof and traffic areas,

  • Retention of rainwater from all decoupled roof and traffic areas via decentralized infiltration systems,

  • Planning of trough elements,

  • Continued use of the property's internal existing lines.

Drained area (AE): 9,010.00 m²

Fee savings/year: EUR 10,433.58 (as of 2008)

Decoupling and rainwater harvesting – residence at the theater in Dessau-Roßlau

Project:

Residenz am Theater
Antoinettenstraße 32/Ferdinand-von-Schill-Straße 21-22
06844 Dessau-Roßlau

Client:

Residenz am Theater GmbH
Hasenwinkel 21 c
06846 Dessau-Roßlau

Project description:

  • Connection of all roof and traffic areas to decentralized infiltration systems,

  • Planning of trough and block infiltration elements,

  • Use of drainage-reducing surface paving in the traffic areas.

Drained area (AE): 790.00 m²

Fee savings/year: EUR 914.82 (as of 2008)

Rainwater retention – KfH Kidney Center, Lutherstadt Wittenberg

Project:

New construction of a KfH kidney center with medical practice
Bahnstraße 11-12
06886 Lutherstadt Wittenberg

Client:

Kuratorium für Dialyse- und Nierentransplantation e.V.
063263 Neu-Isenburg

Project description:

  • Connection of all roof and traffic areas to decentralized infiltration systems,

  • Planning of trough and block infiltration elements,

  • Use of drainage-reducing surface paving in the traffic areas.

Drained area (AE): 2,170 m²

Fee savings/year: EUR 2,170 (as of 2008)

Decoupling and rainwater retention – Golfpark (Hugo-Junkers-Kaserne) in Dessau-Roßlau

Project:

Golfpark Dessau
(former Hugo Junkers barracks)
Junkersstraße 52
06847 Dessau-Roßlau

Client:

Burchard Führer Group
Golfpark Dessau GbR
Willy-Lohmann-Straße 23
06114 Halle/Saale

Project description:

  • Decoupling of all roof and traffic areas from the urban sewage network,

  • Retention of rainwater from all decoupled roof and traffic areas via decentralized infiltration systems,

  • Planning of trough elements,

  • Continued use of the property's internal existing lines,

  • Water supply from existing pipes located deeper to the decentralized infiltration elements according to the principle of communicating pipes via spring pots.

Drained area (AE): 72,250.00 m²

Fee savings/year: EUR 83,665.50 (as of 2008)

Contact

+49 0341 44 25 99 86
E-mail write

Motto

  • Aesthetics and functionality
  • Optimal design and utility value
  • Maintenance and follow-up costs
  • Plot-specific planning
  • Standard-compliant tender documents
  • Financial security

nature-project Landscape architects

Bielastr. 7  –  04178 Leipzig

Phone +49 0341 44 25 99 86

Fax +49 0341 44 25 99 96

info@nature-project.eu

© Copyright - Landschaftsarchitekt Thomas Poser - creating - 123-webseiten.de
  • Home
  • Current
  • Office
  • Portfolio
  • Project Developer
  • Garden Planing
  • Water balance
  • Contact
  • Imprint
  • Data protection
  • Sponge city
Scroll to top

In order to optimally design our website for you and to be able to continuously improve it, we use cookies, Matomo Analytics. By continuing to use the website, you agree to the use of cookies and the Matomo services mentioned above. You can find more information on this in our data protection declaration.

AcceptRejectData protect

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, refusing them will have impact how our site functions. You always can block or delete cookies by changing your browser settings and force blocking all cookies on this website. But this will always prompt you to accept/refuse cookies when revisiting our site.

We fully respect if you want to refuse cookies but to avoid asking you again and again kindly allow us to store a cookie for that. You are free to opt out any time or opt in for other cookies to get a better experience. If you refuse cookies we will remove all set cookies in our domain.

We provide you with a list of stored cookies on your computer in our domain so you can check what we stored. Due to security reasons we are not able to show or modify cookies from other domains. You can check these in your browser security settings.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visit to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps, and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Google reCaptcha Settings:

Vimeo and Youtube video embeds:

Other cookies

The following cookies are also needed - You can choose if you want to allow them:

Privacy Policy

You can read about our cookies and privacy settings in detail on our Privacy Policy Page.

Datenschutzerklärung
Accept settingsData protect
Open Message Bar
  • Deutsch
  • English